Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system

Citations

WEB OF SCIENCE

72
Citations

SCOPUS

57

초록

This paper proposes an analytical model to effectively integrate and synchronize the procurement, production and delivery activities in a supply chain consisting of a single raw material supplier, a single manufacturer and multiple retailers. The manufacturer produces multiple items on a single facility utilizing common raw material under a common rotation cycle policy of not incurring shortages at any retailers. This problem is formulated as a variant of the classical economic lot scheduling problem. The objective is to find the production sequence of multiple items, the common production cycle length, and the delivery frequencies and quantities that minimize the average total cost. An efficient heuristic algorithm is presented to solve the proposed problem. Through numerical tests, we show that the proposed heuristic gives quite satisfactory solutions.

키워드

supply chain management; joint procurement-production-delivery policy; production sequence; common rotation cycle; economic lot scheduling problem; LOT SCHEDULING PROBLEM; INTEGRATED INVENTORY MODEL; FIXED-INTERVAL; VENDOR; MULTIPRODUCT; SIZES
제목
Joint economic procurement—production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system
저자
Kim, Taebok; Hong, Yushin; Chang, Soo Young
DOI
10.1016/j.ijpe.2005.06.005
발행일
2006-09
저널명
International Journal of Production Economics
권
103
호
1
페이지
199 ~ 208