공공공사 일괄발주 낙찰률의 문제점 및 개선방안에 관한 연구

A Study on the Problem and Improvement of Design-Build Deliverly Unit-Price of Public Sector
  • 정덕기
  • 박정로
  • 김경환
  • 김재준

초록

The purpose of this study was to research design-build deliverly method according to unit-price change and to predict the probability of upward and downward movements. Design-build deliverly method unit-price was used with the data which were obtained by Public Procurement Service and five public enterprise of affiliated Transport and Maritime Affairs for project deliverly method of public sector between 2005 and 2009. Project deliverly method in order to secure construction project quality and economic approach by effective selecting should be made effective. Through this research for the advancement of public construction project delivery method has a study for basic research by effective and the improvements.

키워드

공공 건설공사발주방식일괄발주낙찰률
제목
공공공사 일괄발주 낙찰률의 문제점 및 개선방안에 관한 연구
제목 (타언어)
A Study on the Problem and Improvement of Design-Build Deliverly Unit-Price of Public Sector
저자
정덕기 박정로 김경환 김재준
발행일
2010-10
유형
Proceeding
저널명
대한건축학회 2010년도 학술발표대회 논문집
30
1
페이지
305 ~ 306