설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project

초록

Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary’s claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

키워드

설계시공일괄입찰공사설계변경클레임design-buildchange orderclaim
제목
설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구
제목 (타언어)
Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project
저자
류혁준박병주유승규김주형김재준
발행일
2012-05
유형
Proceeding
저널명
한국건축시공학회 학술발표대회 논문집
12
1
페이지
129 ~ 130