교통류 보존형 터널단면 확대 시공기술의 경제적 타당성 분석

Economic Feasibility Analysis of a Tunnel Section Enlargement Method That Does Not Halt Traffic Flow

초록

A recently developed tunnel section enlargement method can maintain traffic flow during construction by using a protector. By keeping traffic flowing, it can minimize the lost time and costs associated with diversions and also the accompanying environmental pollution. On the other hand, installing the protector can lengthen the construction period and increase the direct cost. This paper presents a method for analyzing the economic feasibility of tunnel section enlargement methods considering the direct construction cost and the indirect social cost. The indirect costs are divided into categories of: vehicle driving cost, travel time delay cost, and environmental pollution cost. The economic efficiency of existing technology is compared with the new method in an case study of Namsan Tunnel 3.

키워드

경제적 타당성 분석터널단면 확대 기술직접비간접비economic feasibility analysistunnel section enlargement methoddirect costindirect cost
제목
교통류 보존형 터널단면 확대 시공기술의 경제적 타당성 분석
제목 (타언어)
Economic Feasibility Analysis of a Tunnel Section Enlargement Method That Does Not Halt Traffic Flow
저자
이승수김동규서종원
DOI
10.9720/kseg.2015.4.459
발행일
2015-12
저널명
지질공학
25
4
페이지
459 ~ 472

파일 다운로드