상세 보기
초록
BIM is one of the means of reducing the economic loss caused by design errors. These features of BIM have led to increased use of BIM. With the increasing use of BIM, several studies have been conducted to analyze the performance of BIM. As the importance of BIM staff is emphasized in the performance analysis of BIM, the human resource allocation of BIM staff can become an important research issue. However, there are few studies to measure the workforce effectiveness of BIM staff. Ham et al (2020) measured BIM workforce efficiency using FCFS queue model rules. Since design errors can have different effects on the project depending on the type, there are design errors that must be dealt with first. Therefore, in this study, a priority queue was used to solve design errors with high priority first. The performance of BIM-based design verification was analyzed by quantitatively analyzing the performance of BIM staff when the priority rule was applied to the design error processing sequence.
키워드
- 제목
- 우선순위 규칙을 적용한 BIM 기반 설계검증 성과 분석
- 제목 (타언어)
- BIM-based Design Verification Performance Analysis with Priority Rules Applied
- 저자
- 허승하; 심재형; 함남혁; 김재준
- 발행일
- 2021-09
- 저널명
- KIBIM Magazine
- 권
- 11
- 호
- 3
- 페이지
- 1 ~ 11