대기행렬 모델을 이용한 국내 대규모 공동주택 기초 콘크리트 타설공사 자원 관리 개선에 관한 연구

A Study on the Improvement of the Large-scale Apartment Foundation Concrete Pouring Work in South Korea Resource Management using the Queueing Model
  • 위경수
  • 노석호
  • 함남혁
  • 김재준
Citations

SCOPUS

4

초록

Resource management is essential in a construction project. In particular, resource leveling, which reduces resource fluctuations among resource management methods, prevents resource stagnation and shortage, thereby maintaining a balance between limited construction cost and construction period. In this study, the effect of resource leveling through the queueing model on the construction cost and construction period was quantitatively analyzed based on the data of the case project. First, in this study, the resource-related problems of the case project are described and the state of the queue system is analyzed using the queueing model. Second, the queue system status is analyzed after resource leveling by objective criteria. Third, quantitatively analyze the effect of resource leveling using the queueing model on construction cost and construction period. Through this, the method proposed in this study is verified. This result helps objective decision making in the process planning stage or resource input decision stage, taking into account waiting costs and service costs.

키워드

자원 관리자원 평준화대규모 공동주택기초 콘크리트 타설공사대기행렬 모델Resource ManagementResource LevelingLarge-scale ApartmentFoundation Concrete Pouring WorkQueueing Model
제목
대기행렬 모델을 이용한 국내 대규모 공동주택 기초 콘크리트 타설공사 자원 관리 개선에 관한 연구
제목 (타언어)
A Study on the Improvement of the Large-scale Apartment Foundation Concrete Pouring Work in South Korea Resource Management using the Queueing Model
저자
위경수노석호함남혁김재준
DOI
10.5659/JAIK.2021.37.9.227
발행일
2021-09
저널명
대한건축학회논문집
37
9
페이지
227 ~ 235