Tunnels Construction Planning and Suggestions to Speed up Tunnel Excavation Progress

  • Jo, Byung Wan
  • R.M.Asad
  • Zafar, Baloch
  • Sikandar, M.A.
  • Kim, Heon

초록

Main aim of this study is to explain some suggestions which can be adopt during tunnels constructionby drill and blast. These suggestions are supportive to increase tunnel construction progress. Thesesuggestions basically reduce tunnel excavation cycle by skipping temporarily some activities. Skippedactivities can be carries out later on by combining for two to three cycles. All of these suggestions aredependent upon rock class, water inflow rate and rock stand up time. At one hydro power project thesesuggestions were practically applied to tunnels construction and reduction in time cycle time was morethan 4 hours.

키워드

TunnelsExcavationcyclerockqualityplanningsuggestionsprogress
제목
Tunnels Construction Planning and Suggestions to Speed up Tunnel Excavation Progress
저자
Jo, Byung WanR.M.AsadZafar, BalochSikandar, M.A.Kim, Heon
발행일
2014-10
유형
Proceeding
저널명
2014 대한토목학회 정기학술대회
페이지
591 ~ 592