공동주택 마감공사 공사주체별 작업지연 요인 분석

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works

초록

The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third,it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

키워드

Process ControlConstruction DdelayFinishing Work DurationWork Delay Factor공정관리마감공기공기지연작업지연요소
제목
공동주택 마감공사 공사주체별 작업지연 요인 분석
제목 (타언어)
Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works
저자
이승훈김용만김주형김재준
DOI
10.5345/JKIC.2011.02.1.073
발행일
2011-02
저널명
한국건축시공학회지
11
1
페이지
73 ~ 82