IPA를 활용한 해외 건축 사업 PMC 분야 단계별 업무역량 분석

An Analysis of Competency at Each Phase of PMC for Overseas Arhcitecture Project Using the IPA
  • 하성욱
  • 이석원
  • 김재준

초록

Overseas expansion of domestic construction over the past 10 years has been fast growing. But as a result of simple construction business practices and a focus on EPC, sales margins was reduced. Domestic construction companies have been trying to redirect business to high-value-added-areas but have faced difficulty because there areas are current monopolized by global leading companies in the field of PMC. They have recently carried out 16 PMC related project in order to expand their experience and increase their competitiveness. Most of these construction companies that do PMC overseas have been focusing on the civil engineering sector. analyzing the important and performance result 50 separate PMC tasks in detail using IPA, it became clear that domestic construction companies should also focus on tasks and were analyzed in order to advance to overseas architecture PMC sector overseas. There are large gaps in the importance and performance result of both the planning and pre-construction phase. Importance compared to the current performance levels in the planning phase gap is largest, pre-construction phase has been analyzed in the following order. In particular, one should strengthen detailed tasks in the planing phase. This study is expected to be used as a basic to determine the performance level and tasks items. It is expected strengthen the capacities of domestic companies in the PMC field, for especially in the high value-aded-areas as indicated in the results of the analysis from this study.

키워드

PMC(Project Management Consultant)Overseas Architecture ProjectIPAPMC(Project Management Consultant해외 건축 사업IPA
제목
IPA를 활용한 해외 건축 사업 PMC 분야 단계별 업무역량 분석
제목 (타언어)
An Analysis of Competency at Each Phase of PMC for Overseas Arhcitecture Project Using the IPA
저자
하성욱이석원김재준
DOI
10.6106/KJCEM.2015.16.3.059
발행일
2015-05
저널명
한국건설관리학회 논문집
16
3
페이지
59 ~ 67