According to the 5th national plan for electric power demand and supply, the 3rd HVDC link will be installed between KEPCO and Jeju Island system and go into operation in June, 2016. However, if it adopt LCC HVDC,Jeju power system could be in voltage instable condition. In order to solve the problem, we propose the application of VSC HVDC to the 3rd HVDC project. In the past, VSC HVDC has many disadvantages such as, inefficiency in conversion, size limit, and expensiveness, compared to LCC HVDC. Recently, the new technologies and the demand for renewable energy interconnection are leading a large growth in VSC HVDC market. In this paper, we will introduce the technical and market trends of VSC HVDC and power system stability analysis results for Jeju power system having LCC and VSC HVDCs.

키워드

Power system stabilityLCC HVDCVSC HVDCCommerceDC power transmissionHVDC power transmissionSystem stabilityElectric power system planningElectric power demandsJeju islandJeju power systemLCC HVDCMarket trendsPower system stabilityRenewable energiesVSC-HVDC
제목
제주 HVDC#3 영향 분석
제목 (타언어)
The Effect of HVDC#3 on Jeju Power System
저자
박정수정홍주한영성김래영정정주
DOI
10.5370/KIEE.2011.60.12.2196
발행일
2011-12
저널명
전기학회논문지
60
12
페이지
2196 ~ 2201