공공하수관로 공기 영향 요인 조사 및 적정 공사 기간 산정을 위한 인공지능 방법 비교

Investigation of Construction Duration Influence Factors and Comparison of Artificial Intelligence Methods for Estimating Appropriate Construction Duration in Public Sewerage Construction
  • 이강영
  • 딩지산
  • 임진빈
  • 박상준
  • 김주형

초록

Due to the inability to allocate appropriate construction duration, issues such as construction quality defects and poor workmanship are arising. While general construction projects utilize guidelines for determining construction periods, there has been a lack of guidelines that reflect the specific characteristics of public sewerage pipeline construction, such as extensive outdoor work. This study proposes a guidelines for determining appropriate construction duration for public sewerage pipelines by examining perceptions of factors that delay construction timelines through surveys of experts, based on guidelines for general construction. Additionally, to predict appropriate construction duration, real construction data from 83 projects were used, setting the length of new pipelines, total construction cost, and number of months delayed as independent variables, and the construction period as the dependent variable. The prediction model utilized multiple linear regression, support vector regression, and long short-term memory models, and models were evaluated using the mean absolute error, mean absolute percentage error, and root mean square error. The results indicated that the multiple regression analysis model showed the lowest error in all categories, making it the optimal model for predicting public sewerage construction duration.

키워드

Public Sewerage Pipeline ConstructionConstruction Duration Estimation FactorsGuidelineEstimation Model공공하수관로공사 기간 산정 요인가이드라인예측 모형
제목
공공하수관로 공기 영향 요인 조사 및 적정 공사 기간 산정을 위한 인공지능 방법 비교
제목 (타언어)
Investigation of Construction Duration Influence Factors and Comparison of Artificial Intelligence Methods for Estimating Appropriate Construction Duration in Public Sewerage Construction
저자
이강영딩지산임진빈박상준김주형
DOI
10.6106/KJCEM.2024.25.6.066
발행일
2024-11
저널명
한국건설관리학회 논문집
25
6
페이지
66 ~ 74