상세 보기
국방 전장관리정보체계 연구개발사업의애자일 적용 방안 연구
- 윤성현;
- 임규건
초록
The SW-centered battlefield management information system R&D project takes a long period of 5-10 years or more by applying a complex and rigid batch acquisition strategy. In order to solve this problem, it is necessary to institutionalize a rapid and flexible battlefield management information system R&D project management procedure applying agile development methodology, and a government project management organization and contract management method to support itIn this study, we analyzed the case of applying the Agile development method centered on Scrum to the US SW-centered weapon system R&D project and the characteristics and problems of the battlefield management information system R&D project in Korea, and suggested improvement measures as follows. First, the battlefield management information system R&D model applies the hybrid development method, and the system requirements analysis and system structure design use the existing waterfall development procedure, and the agile method is applied from the SW requirements analysis to the system integration stage. Second, flexible adjustment of performance, schedule, and cost by organizing an Agile IPT in which military (requirements)–DAPA (project management)–developer–functional specialized organizations (test and evaluation, quality, government research institutes, etc.) participate. Third, improving the Basic Order Agreement so that it can be applied to agile R&D.
키워드
- 제목
- 국방 전장관리정보체계 연구개발사업의애자일 적용 방안 연구
- 제목 (타언어)
- A Study on the Agile Approach in Battlefield Management Information System R&D Project in Korea Military
- 저자
- 윤성현; 임규건
- 발행일
- 2021-02
- 유형
- 정기학술지(Article(Perspective Article포함))
- 저널명
- 한국IT서비스학회지
- 권
- 20
- 호
- 1
- 페이지
- 41 ~ 54
- 언어
- KOR
- 출판사
- 한국IT서비스학회
- 발행국가
- 대한민국
- 분량
- 14 페이지
- ISSN
- P 1975-4256