터널 제어발파 공법 및 화약류의 진동전달 특성에 관한 연구

A Study on the Vibration Propagation Characteristics of Controlled Blasting Methods and Explosives in Tunnelling
  • 정혁상
  • 정경식
  • 문홍년
  • 천병식
  • 박두희

초록

The most common problem encountered in domestic tunnel construction sites are solving public resentments caused by damage to adjacent structures and buildings. The most effective excavation method in rock tunnelling is the drilling and blasting, which is the main cause of vibration resulting in the public resentments. In this study, numerical analysis is conducted to compare the vibration reduction effect of line drilling and pre-splitting methods. Furthermore, the numerical simulations are verified and the results are quantified. Finally, various combinations of explosives used in controlled blasting are used and the vibration reduction effects are evaluated, thereby proving the applicability of the controlled blasting for reduction of vibration in tunnelling.

키워드

TunnelNumerical analysisBlasting vibrationControlled blast in roof holeLine drillingPre-splittingTunnelNumerical analysisBlasting vibrationControlled blast in roof holeLine drillingPre-splitting터널수치해석발파진동제어발파라인드릴링프리스플리팅
제목
터널 제어발파 공법 및 화약류의 진동전달 특성에 관한 연구
제목 (타언어)
A Study on the Vibration Propagation Characteristics of Controlled Blasting Methods and Explosives in Tunnelling
저자
정혁상정경식문홍년천병식박두희
발행일
2011-02
저널명
한국지반환경공학회 논문집
12
2
페이지
5 ~ 14