A branch and bound algorithm for disassembly scheduling with assembly product structure

Citations

WEB OF SCIENCE

40
Citations

SCOPUS

53

초록

This paper considers a production planning problem in disassembly systems, which is the problem of determining the quantity and timing of disassembling end-of-use/life products in order to satisfy the demand of their parts or components over a planning horizon. The case of single product type without parts commonality is considered for the objective of minimizing the sum of setup and inventory holding costs. To show the complexity of the problem, we prove that the problem is NP-hard. Then, after deriving the properties of optimal solutions, a branch and bound algorithm is suggested that incorporates the Lagrangean relaxation-based upper and lower bounds. Computational experiments are performed on a number of randomly generated problems and the test results indicate that the branch and bound algorithm can give optimal solutions up to moderate-sized problems in a reasonable computation time. A Lagrangean heuristic for a viable alternative for large-sized problems is also suggested and compared with the existing heuristics to show its effectiveness.

키워드

environmental studiesproduction and schedulingoptimal algorithmPARTS
제목
A branch and bound algorithm for disassembly scheduling with assembly product structure
저자
Kim, Hwa-JoongLee, Dong HoXirouchakis, PaulKwon, Ok-Kyuoung
DOI
10.1057/palgrave.jors.2602568
발행일
2009-03
유형
Article
저널명
Journal of the Operational Research Society
60
3
페이지
419 ~ 430