단지공사의 토공구획 계획 모델

An Earthwork Districting Model for Large Construction Projects

초록

Earthwork in a large construction project such as a land development generally costs 20-30% of the total cost. The earthmoving process, comprising of four repetitive tasks: loading, hauling, unloading, returning, is quite simple and it does not need delicate or advanced techniques. Therefore, earthmoving earthwork planning can heavily affect the cost and time., and Even a slight deviation from the plan can increase or decrease the cost and time. This study presents a planning model that minimizes average haul distance in a large complex construction project. Based on earthwork planning, practitioners’ heuristics, a districting algorithm and Simulated Annealing algorithm were employed to build the model. Districting algorithm plays a role that divides in dividing an earthmoving area into several sections. Simulated annealing provides a function that decides whether a new generated solution is confident. Finally, the proposed model was applied to a real earthmoving project of a large land development. It was found that the model showed approximately 14% improvement in average hauling distance compared to the actual design plan.

키워드

Construction of complexHaul routeCutFillDistricting areaSimulated Annealing (SA)단지조성토공사절토성토구획산출Simulated Annealing
제목
단지공사의 토공구획 계획 모델
제목 (타언어)
An Earthwork Districting Model for Large Construction Projects
저자
백현기강상혁서종원
DOI
10.12652/Ksce.2015.35.3.0715
발행일
2015-06
저널명
대한토목학회논문집(국문)
35
3
페이지
715 ~ 723