사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석

Performance Analysis of BIM Labor using Case Analysis
  • 김형진
  • 유무영
  • 김재준
  • 최창식

초록

BIM is effective to improve the labor productivity of construction participants . From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.

키워드

빌딩정보모델BIM인력대기행렬성과BIMBIM LaborQueue Waiting LinePerformance
제목
사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석
제목 (타언어)
Performance Analysis of BIM Labor using Case Analysis
저자
김형진유무영김재준최창식
DOI
10.13161/kibim.2017.031
발행일
2017-09
저널명
KIBIM Magazine
7
3
페이지
31 ~ 39