주한미군공사 수행을 위한 FED(Far East District) 프로세스 분석에 관한 연구

Analysis of the Construction Process Managed by the U.S. Army Corps of Engineers Far East District Using IDEF0
  • 황재홍
  • 함남혁
  • 김제혁
  • 김재준

초록

A significant number of projects have been managed by US Army Corps of Engineers FED. Today, more information must be provided to the parties involved in the projects by phase than ever before. Specifically,USFK`s construction projects have been managed by FED(Far East District). Recently, however, large US private construction companies have been filling the role previously taken by FED. However, there is few construction managers to implement FED project in Korea. Accordingly, this study analyzes FED projects practices with focus on the construction management actors in order to suggest guideline. This study suggests a model FED construction process(Bid, Contract, Construction, As-Built Phase) by analyzing the existing FED project process using a IDEF0 methodology.

키워드

FEDIDEF0건설품질관리Far East DistrictIntergration DEFinitionConstruction Quality Management
제목
주한미군공사 수행을 위한 FED(Far East District) 프로세스 분석에 관한 연구
제목 (타언어)
Analysis of the Construction Process Managed by the U.S. Army Corps of Engineers Far East District Using IDEF0
저자
황재홍함남혁김제혁김재준
DOI
10.5345/JKIC.2010.10.1.163
발행일
2010-02
저널명
한국건축시공학회지
10
1
페이지
163 ~ 173