대기행렬 모형을 활용한 아파트 골조공사 기준층 인적 자원관리 선정사례에 관한 연구

A Case Study on the Appropriate Construction Personnel of the Typical Floor of Apattment Frame Construction Using the Queueing Model
  • 이정원
  • 김보희
  • 함남혁
  • 김재준
Citations

SCOPUS

0

초록

Quantitative analysis of the number of construction workers and construction period can present a new standard for appropriate personnel. This study presents a Queueing model that predicts the execution time of work procedures, the most important factor among work efficiency indicators. During the working cycle of apartment frame construction the same process tends to be repeated the volume of contruction. Based on these characteristics, this study used a Queueing Model and analyzed reference layer cycle of the delayed frame construction. After adjusting the number of people and the construction period, the performance of the model was analyzed and suggested. This study aims to support the decision making of personnel distribution according to the volume of construction by performing a performance analysis of the Queueing Model.

키워드

대기행렬 모형인적 자원관리기준층 골조공사건설 생산성Queueing ModelHuman Resource ManagementStructural One Cycle Time Scheduling Mechnism of the Typical Floor ConstructionConstruction Productivity
제목
대기행렬 모형을 활용한 아파트 골조공사 기준층 인적 자원관리 선정사례에 관한 연구
제목 (타언어)
A Case Study on the Appropriate Construction Personnel of the Typical Floor of Apattment Frame Construction Using the Queueing Model
저자
이정원김보희함남혁김재준
DOI
10.6106/KJCEM.2022.23.6.003
발행일
2022-11
저널명
한국건설관리학회 논문집
23
6
페이지
3 ~ 14