This study aims to suggest the improved business process by analyzing the current design process on work flow of the 3D design of power plant, drawing a problems and setting the improving direction through the integration method of the business process reengineering(BPR). In order to realize the improved business process, the integrated design performance system focused on the 3D design was established and accordingly the study analyzed cases of project performances through the integration system and drew the improved effects quantitatively. In the result of the project performance applied with the 3D design integration system, it showed 20.4% design cost saving effect for appropriate rated cost and the integration of design information from each design parts, sub contracters and vendors reduced overlapped works and improved the consistency of repeated design alteration.
키워드
- 제목
- 복합화력 발전플랜트에서 업무재설계기법을 이용한 3차원 설계의 개선방안
- 제목 (타언어)
- Improvement of 3D Design Process in the Combined Cycle Power Plant Using Business Process Reengineering
- 저자
- 최홍렬; 문승재
- 발행일
- 2012-09
- 유형
- 정기 학술지(기타)
- 저널명
- 플랜트 저널
- 권
- 8
- 호
- 3
- 페이지
- 55 ~ 63