Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project

Citations

WEB OF SCIENCE

54
Citations

SCOPUS

62

초록

Design errors are one of the major risk factors causing rework and delay. Therefore, accurate cost analysis of potential economic losses attributable to design errors is crucial from a practical point of view. This paper proposes a basis for establishing building information modeling (BIM) investment strategies by quantifying the various costs associated with design errors for error prevention. The design errors were classified into three basic types: simple design (Type 1); rework-related (Type 2) that may lead to demolition and rework; and delay-related (Type 3) likely to prolong the construction period. To evaluate the effects of BIM application quantitatively, the performance potential of BIM-assisted identification of individual design errors was examined. A comparison of the influences of classified design errors on the project revealed that the total cost of the design errors leading to schedule delay was 194.69% higher than that of the simple design errors and the direct design error costs due to errors leading to demolition and rework.

키워드

High-rise buildingDesign errorBuilding information modeling (BIM)Design validationReworkDelayCost analysisReturn on investments (ROI)VALIDATIONIMPACT
제목
Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project
저자
Ham, NamhyukMoon, SungkonKim, Ju-HyungKim, Jae-Jun
DOI
10.1061/(ASCE)CO.1943-7862.0001498
발행일
2018-06
유형
Article
저널명
Journal of Construction Engineering and Management - ASCE
144
6
페이지
1 ~ 13